Todo List

Still to finish:

– Finish installing remaining cab controls (Bell, Fuse Tester, Trip Switch, Horn, Wiper)

– Finish PWM amp gauge control

– Build air gauges / stepper motors

– Optics – this will be a 40″ monitor mounted in the “cab” window

– Finish MSTS interface

A fair bit to do…

Leave a Reply

Your email address will not be published. Required fields are marked *